Return to the Oliver-Mercer Co-op Home PageReturn to the Oliver-Mercer Co-op Home PageOliver-Mercer headquarters building
Return to the Oliver-Mercer Co-op Home PageYour Touchstone Energy CooperativeOliver-Mercer headquarters building
CooperativeService CenterConsumer CornerCustomer ServiceContact UsCapital CreditsSearch
Home > Consumer Corner > Rates & Classes > Schedule F

Schedule F

Security Light Rental

  1. Unmetered on existing 120 volt energized pole
    1. 100 watt     H.P.S. $ 4.25 per month
    2. 175 watt     mercury vapor $ 6.00 per month
    3. 150 watt     H.P.S. $ 6.00 per month
    4. 400 watt     mercury vapor $11.00 per month
    5. 250 watt     H.P.S. $ 8.00 per month
    6. 400 watt     Flood H.P.S. $11.50 per month
  2. Metered on existing 120 volt energized pole
    1. 175 watt mercury vapor $1.50 per month
    2. 100 watt H.P.S. $1.50 per month
    3. 400 watt mercury vapor $3.25 per month
    4. 250 watt H.P.S. $3.25 per month
    5. 400 watt Flood H.P.S. $4.00 per month
    6. Installation includes 150’ of overhead line.
  3. If additional poles are required for a security light a monthly charge of 75¢ will be added for each pole. If an additional transformer is required for a security light, a monthly charge of $1.25 will be added or $15 if paid annually.
  4. Security lights purchased by the consumer cannot be placed on Oliver-Mercer Electric poles. Only Oliver-Mercer Electric lights shall be installed on Oliver-Mercer Electric poles.
  5. A $20.00 fee will be charged when a consumer requests a change in the location of a light, or conversion from one type of security light to another type.
  6. A switch must be installed on any metered rental light. The cost to install the switch will be $100.00.  This includes labor, wiring certificate, mileage and material. If the member requests a 120-volt outlet to be installed with the switch, there is an additional charge of $25.00.  All material will become the member’s property. The installation will be made according to National Electrical Code standards.
Copyright © Oliver-Mercer Electric Cooperative :: All Rights Reserved
Site developed by Basin Electric Power Cooperative