Schedule A
All farm, residential, trailer court, small commercial and single phase servers with maximum of 49 KW, with the following exception: if the installation of a minimun 20KW of electric heat causes the KW to exceed the 49 KW, the consumer will remain on Rate Schedule A, provided the electric heat is metered separately.
Minimum monthly charge is $14.00 or $1.00 per KVA, whichever is greater.
All members requesting service will be required to sign a five-year service agreement.
All trailer court and apartment meters shall be read and billed monthly by the Cooperative.
Special Load Management Rates:
Controlled - Rates Available for 12 months
Water Heater Program:
Uncontrolled - Rates available Oct. 1-May 1
All Electric Heat:
Dual Heat:
Coal/Electric:
Special Notice
If any modifications, "special" wiring changes, or a correction of consumer’s wiring errors are necessary for Co-op personnel to install the Load Management equipment, the additional cost of labor and material will be charged to the member.
Any errors in the wiring of electric heater(s) or device(s) by the member shall be the member's responsibility.
All wiring of electrical devices to be managed must be done according to approved State Wiring Codes and Practices.
Oliver Mercer Electric will contribute $20 per KW for electric heating equipment up to a total of $350.